Welcome back, Fatima
Here's what's moving across MPM's feasibility pipeline.
Feasibility Throughput
Last 12 weeksDeal Mix by Asset Type
YTD 2026Recent Feasibilities
View all →| Deal | Location | Type | IRR | Status |
|---|
AI Activity
Today- REIDIN comps auto-ingested for IC1 Plot 6212099 · 12 min ago
- DLD transaction registered for 2 new Oqood units · 28 min ago
- Investment summary drafted for IC1 Plot 6212099 · 38 min ago
- Assumption flag: 1BR price exceeds REIDIN median by 8% · 1 hr ago
- Sensitivity rerun — construction cost +AED 30/sqft · 2 hr ago
- Quanta supply refresh for Dubai residential · 4 hr ago
Portfolio
47 feasibilities across MPM's pipeline · 14 active · Showing most recent.
| Deal | Location | Type | GDV (AED M) | IRR | NPV (AED M) | Yield on Cost | Analyst | Status |
|---|
New Feasibility
Start a new analysis. AI data ingestion begins once you confirm location and asset type.
Feasibility Type
Asset Type
Location
Preliminary Parameters
International City 1 · Plot 6212099
Residential development · Dubai · Valuation date 30 Jul 2024 · Furnished handover plan
Site & Massing
Extracted from Excel · Project details tabUnit Mix Snapshot
Full breakdown →Pricing · Two Payment Plans
View schedule →| Unit Type | Post-Handover | Construction-Linked |
|---|---|---|
| 1 BR | AED 1,225 /sqft | AED 1,000 /sqft |
| 2 BR | AED 1,175 /sqft | AED 975 /sqft |
Cost Stack
Full model →Timeline
From Excel · Assumption & phasing tabProduct Mix · Unit Breakdown
239 units across 13 apartment types. Extracted from the Product Mix tab and reconciled with Assumption & phasing.
Area Split
Saleable sqftUnit Count by Type
13 distinct floorplan typesFloorplan Types — Detail
1a–1f (1BR) · 2a–2g (2BR)| Type | Config | Qty | Unit Size (sqft) | Total Area (sqft) | % of Saleable | Furnishing Uplift |
|---|---|---|---|---|---|---|
| Total | 239 | — | 165,853 | 100.0% | AED 4.91M | |
How AI Extracted This
- Parsed Product Mix tab — 13 floorplan rows with quantity, min size, max size, total area auto-mapped to unit type schema.
- Reconciled against Assumption & phasing tab — checked total saleable (165,853 sqft) matched between sheets · no variance.
- Cross-checked against Project Details — 239 apartments · 520 target inventory listed in reference towers tab (Index Tower, Park Tower, Liberty House).
- Computed pricing uplifts — furnished premium of AED 15k (1BR) + AED 25k (2BR) = AED 4.91M premium over unfurnished plan.
- Flagged for analyst review — no 3BR / 4BR / Studio / Retail / Office · unusual for this plot size, confirm with project client before IC submission.
Market Data Room
Live feeds from REIDIN, PropertyFinder, Dubai Land Department, Quanta, and ground research. All extraction runs logged.
Extracted Assumptions
47 auto-filled · 3 flaggedIngestion Timeline
Last 24 hours- REIDIN · parsed 142 comps — International City cluster · 12 min ago
- PropertyFinder · 412 active listings mapped — Dubai residential · 28 min ago
- Dubai Land Department · 87 registered transactions in IC cluster · 1 hr ago
- Quanta · 38 supply-pipeline projects within 3 km · 2 hr ago
- Ground Research · broker interviews returned 2 conflicting rental views, flagged · 3 hr ago
- ADIB Market Intel · group-level debt comps refreshed · 3 hr ago
- Excel · parsed 14 sheets × 793 rows from uploaded workbook · yesterday
Assumptions Library
Central register for International City 1 Plot 6212099. Edit any value to trigger a model recompute.
Revenue & Pricing
Hard & Soft Costs
Sales & Marketing Costs
Financing & Regulatory
Payment Plan
Buyer instalments — construction-linked and post-handover. Both variants supported in-model.
Instalment Schedule
60% during construction · 40% on handoverPlan Mechanics
Quarter-by-Quarter
Construction-Linked plan · Q3 2024 → Q1 2027 handoverExample Buyer Journey · 1 Bedroom · AED 673,425
Type 1a · 522 sqft · 1BR @ AED 1,290 /sqft (post-handover)Construction Phasing
Per-quarter completion profile and cost spend. 10-quarter construction window Q1 2025 → Q1 2027.
S-Curve · Quarterly & Cumulative
% of total constructionConstruction Spend · AED M
Outflow per quarterPer-Quarter Schedule
International City 1 — Financial Model
Residential development · Dubai · Last run 4 min ago · Valuation date 30 Jul 2024
Annual Cashflow
10-year horizon · Revenue vs Cost vs Equity CFCost Breakdown
11 line items · fully loaded AED 133.4M| Land Cost | AED 16.29M | (A) |
| Construction — AED 270 /sqft × 313,116 sqft | AED 84.54M | (a) |
| Design Charges — 1.2% | AED 1.01M | (b) |
| Authority Fee — 14/BUA + 10/GFA | AED 6.13M | (c) |
| Architect & Consultant — 1.5% | AED 1.27M | (d) |
| Project Management — 2.0% | AED 1.69M | (e) |
| RERA Site Inspection — 1.0% | AED 0.85M | (f) |
| Management & Operations — 2.5% | AED 2.11M | (g) |
| Miscellaneous (Legal/Valuer) | AED 1.00M | — |
| Contingency — 3.5% | AED 2.96M | (h) |
| Subtotal Hard + Soft Costs (a→h) | AED 100.57M | (i) |
| Brokerage & Royalty — 4.0% | AED 7.91M | (j) |
| Marketing & Sales — 2.5% | AED 4.95M | (k) |
| Development Cost (i+j+k) | AED 113.42M | (B) |
| Total Investment (A+B) | AED 129.71M | (C) |
| Interest @ 8.5% on AED 27.3M debt | AED 5.29M | (F) |
| Loan Processing Fee @ 1.0% | AED 0.27M | (G) |
Revenue & Returns
| Residential Revenue (239 units) | AED 197.82M |
| Retail Revenue | — |
| Total Revenue (D) | AED 197.82M |
| Net Project Income (C+D) (E) | AED 68.11M |
| Debt Raised | AED 27.30M |
| Less Interest + Loan Fee (F+G) | AED 5.56M |
| Net Income Post-Interest (E+F+G) | AED 62.54M |
| Levered Project IRR | 38.20% |
| MPM Equity Hurdle | 15.00% |
| Excess IRR vs Hurdle | +23.2 pts |
Debt Structure
Annual Summary · AED M
| Year | Revenue | Costs | Equity CF | Cumulative |
|---|
Market Comparables
12 comparable transactions · auto-extracted from REIDIN, PropertyFinder, and Dubai Land Department records.
Comp List
Ranked by proximity and relevance (LLM similarity score)| Property | Unit | Size | Asking / Closed | AED /sqft | Source | Date | Status |
|---|
Price per sqft — 1BR vs 2BR
vs our planSource Attribution
Sensitivity Analysis
International City 1 Plot 6212099 · How IRR moves when key drivers shift.
Tornado — IRR Impact by Driver
±1 standard moveHeatmap — 1BR Price × 2BR Price
Levered IRRConstruction Cost Sensitivity
AED /sqft BUA → Levered IRRScenarios
| Scenario | IRR | Net Income (AED M) |
|---|---|---|
| Base Case · AED 1,225 / 1,175 | 38.2% | 62.5 |
| Optimistic · +AED 50/sqft on both | 42.5% | 70.8 |
| Downside · -AED 50/sqft on both | 33.7% | 54.7 |
| Cost Stress · AED 320/sqft BUA | 26.2% | 44.2 |
| Cost Stress · AED 340/sqft BUA | 21.6% | 33.4 |
| Debt Stress · 10.5% rate | 35.9% | 60.2 |
RERA Compliance
Dubai Land Department · Real Estate Regulatory Agency. Escrow, Oqood, inspection, profit-withdrawal governance.
Escrow Account
Al Hilal Bank · A/C 01-ESC-4421Authority Fees
RERA Site Inspections
Bank Audit fee @ 1% of construction cost (AED 0.85M)| Milestone | Scheduled | Audit Focus | Status |
|---|---|---|---|
| 20% completion | 20 Oct 2024 | Substructure · foundations · pour records | Scheduled |
| 50% completion | 25 Jul 2025 | Structural · MEP rough-in | Not due |
| 80% completion | 15 Aug 2026 | Envelope · finishes · fire safety | Not due |
| Handover certification | 30 Jan 2027 | Occupancy permits · Oqood transfers · O&M handover | Not due |
Profit Withdrawal Checklist
DLD e-service prerequisites- ☐ Project status "Completed" on DLD register
- ☑ Real estate developer licence current (expires Dec 2026)
- ☐ 5% escrow retention confirmed in main escrow
- ☐ DLD technical report dated within 6 months
- ☑ Escrow account covers all project obligations
- ☐ Developer undertaking on project continuation
- ☐ Developer undertaking on third-party claims
- ☐ NOC from financing bank (ADIB — pending)
Ask the Model
Tune assumptions in natural language. The model recomputes instantly and logs every change.
Investment Summary
Auto-drafted from model outputs. Review, edit, and publish to the IC.
International City 1 · Plot 6212099 — Residential Development
Recommendation
MPM recommends proceeding with development. At 38.2% levered IRR on AED 129.7M total investment (AED 27.3M debt at 8.5% · balance equity), the deal clears MPM's 15.0% equity hurdle by 23.2 points. Total residential revenue of AED 197.8M across 239 units yields net project income of AED 62.5M post-interest. Market comparables from REIDIN, PropertyFinder and Dubai Land Department validate the AED 1,225 / AED 1,175 per sqft plan for 1BR and 2BR respectively — both within 1% of cluster median.
Key Metrics
| Levered IRR | 38.2% |
|---|---|
| Net Project Income (pre-interest) | AED 68.11M |
| Net Project Income (post-interest) | AED 62.54M |
| Total Revenue | AED 197.82M |
| Total Investment | AED 129.71M |
| Construction Period | 10 quarters (Q1 2025 – Q1 2027) |
| RERA Escrow Retention | 5% (AED 9.89M at completion) |
Key Risks & Mitigants
- Construction cost inflation — base AED 270/sqft is bottom quartile vs REIDIN cluster. Cost stress at AED 320/sqft still clears hurdle (IRR 26.2%). Mitigant: fixed-price GMP contract at tender.
- 1BR absorption risk — model assumes 96 × 1BR sold in Y1; market median is ~17 units/year in cluster. Mitigant: phased launch, broker incentive structure, construction-linked plan as accelerator.
- RERA escrow exposure — 5% retention of AED 9.89M held until handover certification; capital tied up until Q1 2027. Mitigant: priced into debt sizing.
- Financing NOC — profit withdrawal requires ADIB NOC; currently pending. Mitigant: treasury-level engagement pre-Oqood transfers.
Sources
REIDIN rental & transaction comparables (142 listings, IC cluster 2022–2026) · PropertyFinder active listings (412 in Dubai residential) · Dubai Land Department transactions (87 records in cluster) · Quanta supply pipeline (38 projects, 3 km radius) · ADIB Market Intel (financing benchmarks, LTV & rate) · Ground Research (site visit & 4 broker interviews) · Client Excel model (14 sheets, 793 assumption rows).
Maker-Checker Workflow
Every model run and assumption change is logged. Two-stage review ensures governance compliance.
Change Log
- 1BR Price auto-set to AED 1,225 /sqft · REIDIN match · 11 min ago
- Construction cost auto-mapped AED 270 /sqft · MPM Excel · 12 min ago
- Absorption manual override · 52 → 96 /mo (1BR Y1) · 34 min ago
- Model recomputed · Levered IRR 38.2% · Net Income AED 62.5M · 11 min ago